Not every grading job is a whole lot. Plenty are a 12 by 40 foot RV pad, a spot for a hot tub, or a backyard that's gotten lumpy over the years. We level smaller areas to the slope each use needs and compact them so they stay that way.
Grading and Leveling Small Areas in Boise
A lot of our grading work happens inside a fence line. A homeowner in Meridian wants a flat spot beside the garage for a travel trailer. A family in Eagle is putting in a pickleball court. Someone on the Boise Bench has a yard full of dips from old sprinkler trenches and a stump that rotted out. None of these are big jobs, but each one has to come out at the right height and the right slope.
We do this work in Boise, Meridian, Eagle, Nampa, Star, Kuna and Caldwell. Small jobs still get a site visit. Before we bid, we look at how a machine gets into the yard, where water goes now, and what's under the grass, since an old sprinkler line or a buried slab can change the plan.
How Much Slope Counts as Level
Level almost never means dead flat. Most surfaces need a little fall so rain and sprinkler water run off instead of sitting there. What changes from job to job is how much.
- Hot tub pads: as close to flat as we can get. Tubs are heavy and don't tolerate an uneven base. Follow the manufacturer's spec.
- Shed pads: flat, so the floor frame sits square and the doors don't bind.
- Sport courts: about 1 percent in one direction, roughly 1/8 inch per foot. The ball still bounces true and water drains.
- RV and trailer pads: about 1 to 2 percent, sloped side to side or toward the street, so water doesn't pond under the rig.
- Gravel parking areas: around 2 percent, either crowned or pitched to one side.
- Lawns and play areas: gentle fall away from the house. The building code asks for at least 6 inches of drop in the first 10 feet from the foundation.
Those are common targets, not rules. Your concrete contractor, court builder or product manual may call for something different, and we'll grade to their number. Get us the spec sheet or your contractor's target before we start. Grading to a known number is easy. Fixing a pad after the slab or court surface is on it is not.
Pads for RVs, Trailers, Sheds and Hot Tubs
RV and trailer pads
We strip the sod and soft topsoil, dig down to firm ground, and build up a compacted gravel base. In caliche country around Kuna and Nampa, firm ground often shows up fast. On clay it takes more digging and more base. Getting an RV in and out also means checking the curb, the gate and the turning room.
Shed pads
A gravel pad set a bit wider than the shed gives the walls a dry base and keeps the floor off wet soil. We shape the edges so water runs away from the pad, not under it. Sheds on skids or blocks still need a firm, level base, or one corner settles and the doors start to rub.
Hot tub pads
Most tubs sit on a concrete slab, pavers or a compacted gravel base, depending on the tub. We level and compact the subgrade so whatever goes on top starts flat. Plan the power run before we finish, since that trench is easier to dig while the ground is already open.
Sport Courts, Play Areas and Gravel Parking
Sport courts
Basketball, pickleball and multi-sport courts are big flat slabs, so small errors in the subgrade show up later as puddles. We cut and fill to a consistent plane, compact it, and hand it off to the concrete or court contractor. See paving job site preparation.
Play areas
Playsets usually go in a dug-down area that holds a deep layer of wood chips or rubber mulch. We dig it out, level the bottom, give it a way to drain, and leave a clean edge to hold the material in.
Gravel parking
Extra parking for a boat, a work truck or a teenager's car gets the same treatment as an RV pad, with base gravel placed and compacted in layers. Our soil compaction page explains why the layers matter.
Leveling a Lumpy or Sunken Yard
Yards get uneven over time. Sprinkler trenches settle. Old stumps rot. Dogs dig. A low spot by a downspout keeps getting lower. A spot that sinks again every year may have a buried stump or an old trench that was never compacted, so we check what's under it before filling it again. Shallow dips can often be filled with topsoil spreading and reseeded. Deeper problems mean stripping the sod, regrading, and starting the lawn over. If new beds or a new lawn are part of the plan, our grading for landscaping page covers that side.
How We Check Grade
On a small pad, a quarter inch shows. We check grade as we go, with a laser level or a string line depending on the size of the area, and measure from a fixed point like the house foundation or the garage slab. That way the finished surface lands where it was planned, not where it looked right from the seat of a machine.
What Affects Time and Cost on a Small Grading Job
A few things drive the price on a small job. Access is a big one. The gate width decides what size machine fits, and a narrow side yard can mean more trips with smaller loads. How much sod and soft soil has to come out, and whether it can stay on site or has to be hauled, matters too. So does the base. A thicker gravel base over soft clay means more material and more time compacting it.
Why Homeowners Hire Us for Small Grading Jobs
Customers describe us as respectful of their property and budget friendly, and Tanner will tell you plainly what your pad needs and what it doesn't. We're an Idaho registered contractor (RCE-65836) with a 5.0 rating on Google. Call (208) 697-2429 or request a free estimate.