Skip to main contentCall now: (208) 697-2429
Ultimate Excavation LLC
Excavator digging with dust rising at golden hour

Excavating contractor · Based in Caldwell, Idaho

Augering

Augering in Boise and across the Treasure Valley for posts, footings and pole barns.

Highly rated
5.0
Owned & operated
Local
BBB rating
A+
Cities Served
10

Digging post holes by hand in Treasure Valley ground gets old fast, especially once you hit caliche. We drill holes with a hydraulic auger for fences, decks, pergolas, pole barns, signs and more, to the size and depth your plans call for.

Augering Services in Boise

Anyone who has tried to dig a post hole in Meridian or Kuna knows the feeling. The first foot goes fine. Then the shovel hits a layer that feels like concrete. That layer is caliche, a hard, cemented soil that's common across the Treasure Valley, and it's the reason so many people hire out their post holes.

A machine-mounted auger gets through it far faster than a hand auger or a rented one-man unit, and the holes come out straight and to depth. We do augering in Boise, Meridian, Eagle, Kuna, Star, Nampa, Middleton and Caldwell.

Common Augering Jobs Around the Valley

Fence posts

Wood, vinyl and chain link fences all need consistent post holes. On a long property line or acreage fence in Star, Kuna or Canyon County, a machine auger saves days of work. Before we drill, the fence line should be staked or painted, with corner, end and gate posts marked. Gate posts carry more weight, so they often get a bigger, deeper hole. If the fence runs along a property line, confirm where the line is first, since moving a set post is a lot more work than moving a stake.

Deck, porch and pergola footings

Footings for decks, covered patios, pergolas and carports need to go below frost and be the size the plans call for. In Boise, frost depth for footings is 24 inches. Many deck and pergola footings use round cardboard forms set in the hole, so the hole has to be a bit wider than the form. We keep the holes clean so the inspector can see the bottom if your permit calls for a footing inspection.

Pole barns, shops and loafing sheds

Post-frame buildings are popular on acreage around Star, Middleton, Kuna and Parma. They need a lot of large, deep holes in exact spots, which is where an auger earns its keep. The holes have to line up with the building layout, so the corners get squared and staked before we start. If the floor slab comes later, we can prep that pad too. See slab excavation.

Signs, lights and mailboxes

Sign posts, light poles, flagpoles, gate posts and mailbox posts for homes and businesses. The sign or pole maker usually lists a hole size and depth for the base, and some cities want to see it before concrete goes in. Near parking lots and sidewalks, buried power and irrigation lines are common, so locates matter even more.

Trees and landscaping

Holes for planting trees and large shrubs, and holes for drainage, like small dry wells. In caliche, drilling a planting hole through the hard layer lets roots and water get down instead of sitting in a hardpan bowl. A dry well hole gets drilled down to soil that drains, then filled with rock.

How Soil Affects Augering

Different ground drills differently, and it changes how long the job takes. Before we bid, we ask what you've hit digging in the yard before, and we look at the ground on site. Here's what we see most around the valley.

  • Caliche and hardpan. Common in Meridian, Nampa and Kuna. It drills slow, but it drills.
  • Clay. Sticky when wet and hard when dry. Holes stay open well but the auger loads up.
  • Sand and river gravel. Near the Boise River in Garden City and Eagle, sandy and gravelly soil can cave back into the hole. Sometimes the post or form has to go in right away.
  • Rock. Basalt in parts of Southeast Boise and Kuna, and big cobble near the river, can stop an auger. If we hit rock, we'll talk with you about options before going further.
  • Decomposed granite. Foothills lots drill pretty easily.

Hole Size and Depth

The bit size and depth should come from your plans, your post or footing manufacturer, or your building permit. A fence post hole and a pole barn hole are very different. If you don't know what you need, your builder or the permit office can tell you. We'll drill to whatever the job calls for.

Locates Before Every Hole

Post holes go right where buried lines like to hide: along fence lines, near the house and next to driveways. Idaho law requires a Digline (811) request at least two business days before digging, and we make that call. Private lines like sprinkler mains, low voltage lighting and power to outbuildings aren't marked, so tell us what you know about.

What Augering Costs

Price depends mostly on the number of holes, their size and depth, the soil, and how easy it is to get a machine to each spot. A straight fence line across an open yard goes quickly. Holes scattered around a finished backyard with tight access take longer. We give free estimates and can usually price from a site visit or a plan.

More Than Post Holes

Augering is often one step in a bigger job. We also do site preparation and grading for pole barns and shops, trenching for power and water to new buildings, and dirt hauling when there's spoil to get rid of.

We're an Idaho registered contractor (RCE-65836) with a 5.0 rating on Google. Call (208) 697-2429 or request a free estimate.

What Our Customers Say

Rated 5.0 out of 5 from 25 Google reviews.

6 five-star reviews

  • We've worked with these guys on several pool forming and excavation projects. They're on time, work hard, and do great work. Would recommend to other builders!

    Cassi G.

  • Our main water line burst and I had no idea who to call to fix this problem. Thankfully Tanner at Ultimate Excavation came to save the day!! He gave me three different quote options and explained everything in detail. Very knowledgeable and professional. They were able to start the project immediately! 10/10 recommend.

    Sajra I.

  • Tanner and his crew do a fantastic job digging pools for us. Always flexible with schedule, professional, and great communication. He also dug and installed a septic system for me and did a great job and at a great price! Our entire team highly recommends using ultimate excavation, you won’t be disappointed!

    Stanley M.

  • Tanner and his crew put in a stone block retaining wall and drainage around our home. They were timely, professional, and paid attention to all the small details. We are very happy with the work and will use them again!

    Steve G.

  • Tanner and his whole crew was so great to deal with! Tanner has great communication, got us a bid quickly and was able to get to our job well before the rains came which we really appreciated!

    Kendra Z.

  • Such a great company to work with. The owners are solid people, the quality of work is top-notch, and they genuinely care about their customers and the end result. They get the job done right.

    Sara V.

Frequently Asked Questions

How deep do deck and fence post holes need to be in Boise?

Footings for decks and covered structures need to go below frost, and Boise uses 24 inches as its frost depth. Fence post depth depends on the fence height and type. Your plans or the manufacturer's specs will give the exact depth.

Can you auger through caliche?

Yes. Caliche is slow going by hand but a machine auger gets through it. Rock is harder, and we'll talk with you before going further if we hit it.

Can you auger holes for a pole barn?

Yes. Pole barns and post-frame shops are common jobs for us, especially on acreage in Star, Kuna, Middleton and Canyon County.

Do you need to call 811 before augering?

Yes. Idaho requires a Digline locate request at least two business days before digging, and we make that call for every job.

How should I get my yard ready for augering?

Mark where each hole goes with stakes or paint, and clear a path for the machine to reach every spot. Tell us about private lines like sprinklers, low voltage lighting or power to a shed, since Digline doesn't mark those. Moving furniture, pots and anything stored along the route helps the day go faster.

What happens to the dirt from the holes?

Augering leaves a small pile next to each hole. On most fence and deck jobs it gets spread nearby or used to backfill around the posts. If there's a lot of it, like on a pole barn, we can haul it off.

Get in touch with Ultimate Excavation LLC